- Member ID
- #1246
- Messages
- 1,723
- Reactions
- 3,218
- Likes
- 212
- City
- Open Space
- State
- CO
- Country
- United States
- Vehicle
- 2018 Demon; 2006 Viper (Arrow)
As of midnight tonight Unifor workers are on strike in Canada. For those waiting for their Demon to get built before the Brampton plant permanently turns into a pumpkin for the Challenger platform, this is bad news. No other way to spin it, unfortunately.
I'm very thankful that my allocation was VIN-matched and built early. For those still in wait mode, let's hope this impasse gets settled quickly. If not, with less than 2 months on the clock, Dodge may not end up building all Demon 170s before the swapover to EV starts on 12/23/23. This is an unwelcome development since Dodge is already behind schedule with just over 1600 (of the 3326 planned) cars built so far.
https://www.cbc.ca/news/canada/windsor/stellantis-unifor-contract-negotiations-1.7012239
I'm very thankful that my allocation was VIN-matched and built early. For those still in wait mode, let's hope this impasse gets settled quickly. If not, with less than 2 months on the clock, Dodge may not end up building all Demon 170s before the swapover to EV starts on 12/23/23. This is an unwelcome development since Dodge is already behind schedule with just over 1600 (of the 3326 planned) cars built so far.
https://www.cbc.ca/news/canada/windsor/stellantis-unifor-contract-negotiations-1.7012239
- 1
- Show All